|
Too many perils
threaten an organization’s assets and interests. In order to design a
comprehensive loss prevention and control program, perils must be recognized
and classified according to their severities and frequencies.We
have considerable expertise in implementing such programs by our
professional staff. They analyze the project and assess the different risks
related to it, and provide a “Risk Assessment Report” that elaborates the
overall picture of the situation, and indicates the crucial factors for loss
prevention and hazard control.Services
rendered:
-
Inspecting
the plant and preparing a layout that indicates risk areas.
-
Inspecting
the security system and the relevant executive team in order to ensure
their readiness for action.
-
Conducting
an interview with the employees and managers in order to evaluate
executive systems and performances.
-
Investigating the operating environment to recognize factors that increase
risks.
-
Carrying
out surveys for valuation of factories and plants, equipment, machinery,
security systems, fire-fighting installations, raw materials, finished
products, constructions, fittings, fixtures, etc., in order to determine
the insurable values and the Estimated Maximum Loss (EML).
-
Planning
out a “Risk Prevention Programme” to improve effectiveness and
productivity.
The
“Risk Management” division plays an effective role in providing its services
to industrial, oil, gas and energy projects at different stages of
construction, implementation and production.
This department has
rendered the above-mentioned services for the following projects:
-
Karoon 4
Dam
-
Bandar
Imam Petrochemical Complex
-
Fajr
Jam Kangan Oil Refinery
-
Mazandaran Wood and Paper
Industries.
-
DMT
-
Saipa
Plant
|